Español English Français
54321

Installations

ArgentinaAustraliaBangladeshChileChinaFranceGabonGermanyHollandIndonesiaIranIsraelItalyIvory CoastKenyaLibyaMalaysiaNew ZealandPeruPolandPortugalRomaniaRussiaSpainTaiwanThailandTurkeyUSA

Germany

Installation

2 thermal oil heaters of 8 Gcal/h with dust burner.

Application

Manufacture of MDF. 


Argentina

Installation

Thermal oil heater of 3 Gcal/h with automatic combustion chamber and muffle. 

Application

Furniture manufacture, varnished panels 


Australia

Installation

Oil heater of 6 Gcal/h. with fuel burner + dust injection.

Application

Manufacture of formica, presses.


Bangladesh

Installation

Oil heater of 2 Gcal/h. with mixed burner fuel/gas

Application

Multinational manufacture of automobiles, paint drying.


Chile

Installation

Heater of 7 Gcal/h. with combustion chamber for waste, automatic feeding by stoker 

Application

Manufacture of moldings and doors.


China

Installation

Thermal oil heater of 2.5 Gcal/h. with combustion chamber of travelling grates. 

Application

Manufacture of polyurethane.


Ivory Coast

Installation

Heater of 5 Gcal/h. with combustion chamber, manual feeding.

Application

Wood transformation. 


USA

Installation

Burner heater natural gas and steam generator. 

Application

Automobile auxiliary industry and plastic. 


Spain

Installation

Hot water boiler of 2 Gcal/h with built-in furnace and waste feeding stoker. 

Application

Lacquers and varnishes. 


Installation

3 Calderas auxiliar de aceite térmico con quemador gas para planta termosolar. 

Application

Generación de energía.


Installation

2 acquatubular overheated water boilers of 3 Gcal/h with waste combustion chamber and automatic feeding stoker. 

Application

Manufacture of doors. 


France

Installation

2 thermal oil heaters of 12.5 Gcal/h with natural gas burner and 2 steam generators of 27 Tm/h. 

Application

Manufacture of MDF and conglomerate.


Indonesia

Installation

Thermal oil heater of 9 Gcal/h with solid waste combustion chamber and automatic feeding stoker.

Application

Conglomerated board manufacture. 


Italy

Installation

Thermal oil boiler of 6.5 Gcal/h with combustion chamber of movable grate and dust injection

Application

Manufacture of MDF, generation of electrical energy.


Kenya

Installation

4 Heaters of 4 Gcal/h with waste combustion chamber and movable grate. 

Application

Lumber industry. 


Libya

Installation

Thermal oil heater of 4 Gcal/h with fuel burner.

Application

Refinery.


Malaysia

Installation

Thermal oil heater of 1.5 Gcal/h with fuel burner.

Application

Asphalt manufacture.


New Zealand

Installation

2 thermal oil heaters of 6 and 4 Gcal/h with fuel burner

Application

Textile industry


Peru

Installation

Heater of 1 Gcal/h with combustion chamber and automatic feeding stoker

Application

Lumber industry


Portugal

Installation

Installation composed of 2 thermal oil heaters of 14 Gcal/h with movable grate chambers and 1 heater of 5 Gcal/h for sandpapering dust. 

Application

Plant of board manufacture.


Romania

Installation

Thermal oil heater of 8 Gcal/h with combustion chamber of movable grate. 

Application

Manufacture of doors, moldings and wood windows.


Russia

Installation

Thermal oil heater of 6 Gcal/h with double combustion chamber and waste automatic feeding stoker. 

Application

Board and plate manufacture. 


Taiwan

Installation

3 thermal oil heaters of 15 Gcal/h with fuel burner. 

Application

Plant production of plastic and energy. 


Turkey

Installation

Thermal oil heater of 7 Gcal/h with double automatic waste feeding stoker chamber. 

Application

Plant of MDF production. 


Gabon

Installation

Heater of 4 Gcal/h with waste combustion chamber remainders and automatic feeding stoker. 

Application

Lumber industry. 


Holland

Installation

Thermal oil boiler of 8 Gcal/h with burning natural gas. 

Application

Manufacture of plastic bottles. 


Iran

Installation

Thermal oil heater of 2 Gcal/h with fuel burner

Application

Toasting of pistachio


Israel

Installation

Thermal oil heater of 7 Gcal/h with dust burner and 1 heater of 7Gcal/h with combustion chamber and movable grate. 

Application

Wood transformation.


Poland

Installation

Thermal oil Heater of 0.4 Gcal/h with fuel burner. 

Application

Manufacture of doors and windows.


Thailand

Installation

4 thermal oil heaters of 7.5 Gcal/h with combustion chamber of movable grate.

Application

Manufacture of paper.


Mapa de instalaciones de Sugimat
SUGIMAT S.L.: C/ Colada d'Arago s/n - Quart de Poblet (Valencia) - 46930 ESPAÑA.
TLF 961597230 - FAX 961920026 - General: sugimat@sugimat.com - Comercial: sug4@sugimat.com
© Copyright Sugimat 2010
Fondo Social Europeo Impiva